![]() |
|
![]() |
|
ROYAL NATIONAL COLLEGE FOR THE BLIND - RNCB |
|
![]() |
![]() |
(Click on an image to go to a larger version) The College is based on the outskirts of Hereford. It is a large residential campus for around two hundred people of all ages. CCE were sub-contracted by Morgan Ashurst as the main contractors to surface the footpaths around the campus. Due to the sensitivity of the project and the need for the students to move around the campus with ease and independently, the remit was to delineate the main pathways to entrances and exits on the campus with contrasting aggregates. The solution was to surface the main area with a 1-3mm Autumn Gold, with a band of 1-3mm Black Basalt running through the path to aid the students to the areas they wish to be. The works were completed over two phases with the minimum of disruption to the staff and students at the College. We hopefully look forward to the next phase of works in the near future. ENDS March 2009 |
|
Cirencester Civil Engineering Limited |
|