![]() |
|
![]() |
|
| CASE HISTORY | |
![]() |
Norgine Offices, Hengoed, Mid Glamorgan CCE Ltd were asked to repair work initially undertaken by others. This required breaking out and disposing of the existing surface, before re-instating an area 120 m2 of pedestrian footpath to the offices main entrance in Addaset 6mm Lucerne Silver at 15mm depth. |
![]() ![]() |
|
|
|
Cirencester Civil Engineering Limited |
|